Page 41 - Water and DSİ

Basic HTML Version

40
CHAPTER III - HYDROELECTRIC ENERGY
ASLANTAġ DAM
Embankment Type:
Composite Filled Dam
Location: Osmaniye, h (form talweg)= 95 m,
Construction date: 1975-1984
Purpose: Irrigation, Flood Control, Energy (Installed Capacity 138 MW)
View
Cross-section
ATATÜRK DAM
Location: Şanlıurfa, h (from talweg)= 169 m, Embankment Type:
Claycore Rockfill Dam
Construction date:1983-1992, Purpose:Irrigation and Energy (Installed Capacity (2400 MW)
View
Cross-section