Page 42 - Water and DSİ

Basic HTML Version

41
CHAPTER III - HYDROELECTRIC ENERGY
KÜRTÜN DAM
Dam Type:
Concrete Faced Rockfill Dam (CFRD)
Location: Gümüşhane, h (from thalweg)= 133 m,
Construction date: 1999-2002
Purpose: Energy Installed Capacity(85 MW)
View
Cross-section
BATMAN DAM
Place: Batman, Construction date:
1986-1999,
Type:
Clay Core Composite Filled Dam
Aim: Irrigaiton, Flood Control, Energi (Installed Capacity 198 MW) h(talveg)=72 m
View
Cross-Section