Page 44 - Water and DSİ

Basic HTML Version

43
CHAPTER III - HYDROELECTRIC ENERGY
GORDES DAM
Place Manisa,
Const. Date: 1998-2008
Type: Concrete Faced Rockfill Dam (CFRD)
Aim: Irrigation and Water Supply, h (thalweg)= 95 m
1
1.40
1
1.5
8.00
15.00
5.00
5.00
270.40
2C
2B
Perde
Enjeksiyonu
3B
2B
2C
3A
3B
Geçiş Zonu
Kaya Dolgu
Kaya Dolgu
3A
260.00
View
Cross-section
MURATLI DAM
Embankment Type:
Asphalt Faced Rockfill Dam
Location: Artvin,
Construction date: 1999-2005,
h (from thalweg)= 44 m
Purpose: Energy (Installed Capacity (115 MW), Flood Control
View
Cross-section