Page 45 - Water and DSİ

Basic HTML Version

44
CHAPTER III - HYDROELECTRIC ENERGY
CINDERE DAM
Location: Denizli,
Const. date: 1994-2007
,
h (from thalweg)=78 m
Embankment Type:
Hardfill
Purpose: Irrigation and Energy (Installed Capacity 29 MW)
View
Cross-section
BEYDAĞ DAM
Location: Izmir Aim: Irrigation
Construction date: 1994-2007
Embankment Type:
Roller Compacted Hardfill
h (from thalweg)= 51 m
View
Cross-section