CHAPTER V - DOMESTIC WATER SUPPLY
The approximate total length of transmission pipeline, including concrete, ductile, steel and glass-
reinforced pipe (GRP) with different diameters has reached 2.112 km since 1968. Water supply
projects developed by DSİ have met 1/3 of domestic and industrial water consumption
requirements so far.
As per the Law No.167–the “Law as to Groundwater Resources”, groundwater permission is to
be obtained by applying to DSİ General Directorate if well depths are greater than 10m depth. In
this context, water supply is obtained from groundwater for the cities in which there is no water
supply system from surface water sources or surface water is not enough to meet the demand.
5.3. Water Supply Projects in the Investment Program
The Law stipulates that DSİ could give priority to realize waste water treatment plants on the
grounds of health and environment considerations. According to the action plan prepared in
2010 for 81 provinces; the supplied water amount will be enough for;
Long term (2024-2040) in 36 provinces,
Middle term in 26 provinces (2016-2023),
Water scarcity is anticipated to occur in 10 provinces in short term (2013-2015) and
Water scarcity will occur in 9 provinces between the years (2010-2012) and it is also estimated
that emergency drinking water supply might be necessary therefore related works are in progress.
According to the action plan prepared for county towns, population of which are above 50,000;
the supplied water amount will be enough for 66 county towns;
Long term (2024-2040) in 35 county towns,
Middle term in 14 county towns (2016-2023),
Water scarcity is anticipated to occur in 14 county towns in short term (2013-2015), and
Water scarcity will occur in 3 county towns (Cizre-Şırnak, Ergani-Diyarbakır, Yüksekova–
Hakkari) between the years (2010-2012) and it is also estimated that emergency drinking water
supply might be necessary therefore related works are in progress.
As for the action plan prepared in 2010, the works to be done in the following 9 province centers
needing urgent water supply can be summarized as follows;
1-ADIYAMAN: It is aimed water need of the city will be met till 2020 by water supply project
from the springs of Havşari, Çokpınar, Mir, Balıksırtı and Şelale. Within scope of the project, the
phase 1 construction of the conveyance line and the connection between two tanks have been
completed in 2011.
2-AYDIN: Long term domestic and industrial water need of the city will be supplied from
Ikizdere Dam. The conveyance canal is nearly over. The treatment plant started is under
construction. The conveyance canal of the water supply project for settlements in close vicinity
of Aydın is in progress.
3-ÇANKIRI: The long term domestic and industrial water need of municipalizes of Dodurga,
Orta, Dumanlı, Taşkaracalar, Kalfat, Şabanözü, Eldivan, Elmalı, Gümerdiğin, Gürpınar,
Yaylakent, Karaören and Sarayköy as well as the center of Cankırı province will be supplied from
Güldürcek Dam. Having been completed the constructions of the treatment plant and
conveyance lines in 2010, water is supplied to the city. Conveyance Project of phase 3 and 4 as
well as waste water treatment plant are in progress.
4-İZMİR: The medium term water need of the city will be supplied from Gördes dam reservoir
in which water filled from 2008 till 2010. The first stage of the conveyance line construction was
finished in 2010. The second stage of the conveyance line was put out tender in 2011 by DSI.