CHAPTER V - DOMESTIC WATER SUPPLY
the Asian side and European side have been excavated and the lining of these tunnels was
completed. The treatment plant was completed in 2011.
(SP 1)
Melen Regulator
and Pumping
Station
(SP 2)
Melen Rising Tank
and Conveyance
Line L=69 284 m
(SP 3)
Conveyance Line,
L=69 665 m.
(SP 4)
Yeşil Vadi
Conveyance
Line
(SP 1)
Cumhuriyet
Pumping
Station and
Force Main
(SP 5)
Cumhuriyet Treatment Plant
720 000 m
3
/day
(SP 6)
Osmankuyu- Kağıthane
Conveyance Line and
the tunnel
(SP 7)
Bosphorus
Sea Crossing
by Tunnel
L=(5,551 m
Yeşilçay link
Regulator (Isakoy
and Sungurlu)
Yeşilçay-
İsaköy
Pumping
Station
Yeşilçay
Conveyance Line
Yeşilçay- Emirli Yavuz Treatment Plant
Melen-Yeşilçay Link
Istanbul Melen Water Supply Project Scope
Stage
Supplied Water
Water
Intake /
Storage
Facility
Transmission Main
Pumping
Capacity
(m³/s)
Water
Treatment Plant
capacity
(m³/day)
Diameter
(mm)
Capacity (m³/s)
(hm³/year) (m³/s)
I.
268
8.5
Regulator
Intake
Ø 2,540
8.5
8.5
720,000
II.
307
10
Dam
Ø 3,000
15
10
800,000
III.
307
10
Ø 3,000
15
10
800,000
IV.
308
10
-
-
10
800,000
Total
1,190
38.5
38.5
38.5
3,120,000
Work packet 4 composed of Şile Control Centre, Yeşilvadi Transition and Conveyance Tunnels.
The total length of the tunnel of the 4th work packet approximately is 12 km, 84% of which has
been completed. 5,454 m length conduit work of work packet 4 started. Phase 1 of Istanbul
Melen Project to convey water from Melen stream to Istanbul is aimed to be completed in 2011.
In the scope of Phase I of Yesilcay and Melen System, 235 km pipe line diameters of which are
3m and 2,5m are being laid down. The greatest treated water pumping station in Europe is under
construction. First in history, a tunnel is being crossed under the Istanbul Bosporus. The biggest